Basement & Rear Extension With Internal Remodel

Project Details

Client Type: Private Client

Location: Tooting Bec, London

Duration: 52 Weeks

Completion: December 2023

Key Challenge: Large basement extension beneath the existing property

How We Overcame That Challenge: A Robust and detailed temporary works plan was carried out, and CPD for site staff was provided weekly on basement digging and pinning measures.

Stand Out Features:

Ultra high and slimline sliding doors

Large frameless skylights

Bespoke kitchen cabinets

Bespoke joinery

Bespoke oak staircase

Architect: Studio MASS

Structural Engineer: Croft Structural Engineers

QS/Cost Consultant: Turnkey Building Contractors

Scroll to Top