Client Type: Private Client
Location: Westcliff, Essex
Duration: 32 Weeks
Completion: August 2023
Key Challenge: A Complex structural steel frame that had to be incorporated into the existing building
How We Overcame That Challenge: Implementing a robust temporary works design and bringing in sophisticated lifting equipment to move the extra-large steels
Stand Out Features:
Charred timber cladding to the external
Bespoke kitchen cabinets
Architectural shape windows
High-quality cork flooring
Hand-made tiles
Architect: Corti Mitchell
Structural Engineer: Crucis Designs
QS/Cost Consultant: Turnkey Building Contractors